Infrastructure

The engines are assembled in our dedicated state-of-the-art Engines Plant. The plant consists basically two types of facilities viz. Testing and Assembly.

Engine Assembly Lines :

2 Cylinder Cooper Engines Assembly line

  • This assembly line is a fully automated line
  • The assembly line has a capacity of assembling more than 18,000 engines per year
  • Precision auto-manufacturing
  • Online leak testing facility

3/4/6 Cylinder Cooper Engines Assembly line

  • This assembly line is a semi-automated line
  • The assembly line has a capacity of assembling more than 9,000 engines per year
  • Clean room assembly for precision component assembly like injectors

Engine Testing Facilities :

Testing facility consists of engine test beds.The test beds are designed to test the compliance of the assembled engine with its ratings, performance and capacity (load). There are 3 test beds for 2 Cylinder Cooper Engines and 2 test beds for 3/4/6 Cylinder Cooper Engines. Some of the tests carried out in the test beds are detailed below.

Mode Testing Test Beds

5 Mode test consists of the following-
Speed, Power, Fuel Consumption, Engine Temperature & Pressure, Blowby & exhaust are checked in the 5 mode test bed.
8 Mode test is carried out for variable speed engines of tractors and other heavy duty engines.
13 Mode test is carried out for automotive (variable speed engine).

Horiba testing facility

Cooper Corp has in-house emission testing facility. This has been installed from Horiba, Japan, at an investment of INR 4 Cr. This test bed is commissioned for testing the swirl movement and emission levels for all the bigger engines (3/4/6 Cylinder Cooper Engines). There are also Cold Testing and Hot Testing Test Beds commissioned to test all the engines.